EasyManua.ls Logo

Sym X'PRO RV125 - Oil Pump Installation

Sym X'PRO RV125
275 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. LUBRICATION SYSTEM
3-6
Install the oil pump cover and fixing pin properly
Tighten screw
Make sure that oil pump shaft can be rotated
freely.
Oil Pump Installation
Install the oil pump, and then tighten bolts.
Torque value: 0.8~1.2 Kg-m
Make sure that oil pump shaft can be rotated
freely.
Install oil pump driving chain and sprocket, and
then install snap ring onto oil pump shaft.
Install starting gear and generator.
SCREW×1
To this chapter contents

Table of Contents

Related product manuals