EasyManua.ls Logo

SYSMEX SP-10 - Analyzer Maintenance Procedures; Daily Maintenance Tasks

SYSMEX SP-10
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Document Ref: SUKBMS-24-
601
Version: 2.0
Page | 17
Date: 19/07/2021
Maintenance
There are two types of shutdown that need to be performed on the SP-series analyzer,
Shutdown 1 should be performed at least every 24hrs if analyzer continuously in use, six
days a week.
Shutdown 2 Should be performed once a week on the day that shutdown 1 is not
performed.
Shutdown 1 (daily)
Shutdown 2 (Weekly)
Function
Cleans Hydraulic lines
Cleans hydraulic lines and stain
chambers
Duration
Approx. 15mins
Approx. 20 mins
Requirements
12 single cassettes in supply
table
Minimum 450ml methanol
2mls CELLCLEAN
9 single cassettes in supply
table
Minimum 800ml methanol
2mls CELLCLEAN
To perform either shutdown procedure ensure that the analyzer status displays ready. NOTE: If
analyzer is on a tracked system please ensure analyzer is isolated so that no further work is sent
to the SP-series analyzer.
Shutdown 1 (Daily)
Ensure analyzer status is READY. From main menu select the [Shutdown] to open the shutdown
menu. Select the either [Shutdown1 (Daily)]. The corresponding shutdown confirmation screen will
appear. Ensure that all cassette and methanol requirements are fulfilled.
12 Slide cassettes in supply table
400ml of methanol
2ml of CellClean in the sample rack in front of the aspiration position
Place 2mls of CellClean into a blank sample
tube with cap on, Place tube in position 10 of
sample rack on left hand side of sampler unit
and align with mark.
Daily Maintenance

Related product manuals