CHECKING FOR PROPER ALIGNMENT
5. Align the #3 boom section with the #2 boom section in the same manner as
step 4 by shimming and installing pads “10”.
6. Align #4 (tip) boom section with the #3 boom section in the same manner as
step 4 by shimming and installing pads “8”.
7. Shim and tighten pads “2”, “4”, and “6” to 1/32 inch clearance between the
pad surface and the boom section on each side with the boom extended.
8. Grease the boom ahead of the wear pads.
257REVISED: