EasyManuals Logo

Terex RT500-1 User Manual

Terex RT500-1
361 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #281 background imageLoading...
Page #281 background image
Wire rope and reeving
MAINTENANCE
All wire ropes in active service should be inspected DAILY along with spooling, sheaves,
wedge sockets, and any other wire rope fittings for damage. Once WEEKLY a through wire
rope inspection should be made by a competent inspector. A record should be kept of the
inspections.
Refer to Wire Rope Users Manual and ANSI Standard B30.5 for guidelines covering the
inspection, maintenance, repair, and replacement of wire rope. Worn, kinked, birdcaged,
fatigued or otherwise damaged wire rope must be removed immediately. Wire rope when
properly installed, lubricated and employed, will give many hours of satisfactory use.
Whereas, a new piece of wire rope can be immediately ruined if misused.
Crushed Rope
Remove At Once!
Kinked Rope
Remove At Once!
Bird Caging
Remove At Once!
Replace or repair any items found to be in unsatisfactory condition.
RT500
Service / Parts
278 REVISED:

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex RT500-1 and is the answer not in the manual?

Terex RT500-1 Specifications

General IconGeneral
BrandTerex
ModelRT500-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals