4-1 TV800/900 Roller 0102-3 November 2009
Installation
Delivery Checks
Immediately upon taking delivery of your new machine and
before putting it into service:
• Read this handbook completely - it could save a great deal of
unnecessary expense. Place this Instruction Manual in its
holder (A).
• Read the engine manufacturers handbook supplied with this
machine.
• Check general condition of the machine - has it been
damaged during delivery?
• Raise folding ROPS, if fitted, and install all pins and locking
rings.
• Fit flashing beacon to ROPS.
• Check fluid levels - see Pre Start Checks on page 4 - 2.
Articulation Lock
If the machine has been delivered by a lorry or trailer the
articulation lock (B) may have been fitted. This must be
released before the machine is used. Failure to release the
articulation lock will make the steering inoperative and cause
serious damage to the machine.