EasyManua.ls Logo

Texi Iris 10 - Bobbin Case Installation and Machine Startup

Texi Iris 10
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Texi Iris 10 Operation Manual
17
Bobbin case installation
Insert the bobin case into the bobbin case base (2) in a
way that the outstanding part of the bobbin case (1) is
parallel tot he hollow in the bobbin case base (2).
Insert the bobbin case until it is completely placed.
Close down the bobbin case cover
Starting the machine
Insert power wires into the machine and then insert pow-
er plug into power socket.
NOTE: To prevent injury, keep hands and other objects away from needle bar and other movable parts of embroidery.
Turn the main power switch to “I”.
Machine and LCD display will be turned on.
After turning the machine on, needle bar will automatically move to its initial position.

Related product manuals