The EI Battery – Place and Prepare
EI Residential Solar Solution US Installation Manual | www.tigoenergy.com | Help Center 36
Place and Prepare
To place and prepare a battery:
1. Choose a location with:
• A level floor.
• A plumb wall.
• Minimum 914mm (3ft) clearance side-to-side and top.
• No direct sun or precipitation.
2. If mounting against a wall, affix the two side tabs.
3. Remove the front panel screws and two locking clips behind the base cover and open
the enclosure.
4. Detach the display and ground cables.