EasyManua.ls Logo

Toro Reelmaster 5210 - Piston (Traction) Pump Flow Test

Toro Reelmaster 5210
304 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reelmaster 5010 SeriesHydraulic System (Rev. C) Page 4 -- 38
Piston (Traction) Pump Flow Test (Using Tester with Flow Meter and Pressure Gauge)
Figure 35
FORWARD
M7
M6
FROM STEERING CONTROL VALVE
R9
100 MESH
SUCTION
STRAINER
INTERNAL
CASE
DRAIN
TRACTION
WHEEL
MOTORS
P1
P2
P3 P4
G5
G6
B
R5
R4
R3
A
B
A
B
LH RH
EXTERNAL CASE DRAIN (TO RESERVOIR)
A
P5
TO LIFT CONTROL MANIFOLD
TO STEERING CONTROL VALVEAND CHARGE CIRCUIT
TO MOW CONTROL
(REAR CUTTING UNITS)
(FRONT CUTTING UNITS)
TO MOW CONTROL
TESTER
Procedure for Piston (Traction) Pump Flow Test
Thistestmeasurespiston (traction) pump output (flow).
During this test, pump load is created at the flow meter
using the adjustable load valve on the tester.
IMPORTANT: Traction circuit flow for your Reel-
masterisapproximately30GPM(113.5LPM).Use40
GPMHydraulicTester#AT40002(pressureandflow)
for this test (see Special Tools in this chapter).
1. Make sure hydraulic oil is at normal operating tem-
perature by operating the machine under load for
approximately ten (10) minutes. Make sure the hydrau-
lic tank is full.
2. Parkmachineonalevelsurfacewiththecuttingunits
loweredand off.Shutoffengine.Makesure mowspeed
limiter is in the transport position to allow full movement
of traction pedal.
3. Read Precautions For Hydraulic Testing in this sec-
tion.
CAUTION
Beforeopening hydraulicsystem,operate allhy-
draulic controls to relieve system pressure and
avoid injury from pressurized hydraulic oil. See
RelievingHydraulicSystemPressureintheGen-
eral Information section of this chapter.

Table of Contents

Other manuals for Toro Reelmaster 5210

Related product manuals