EasyManua.ls Logo

Toro RT1200 - Preparing to Operate the Machine

Toro RT1200
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstallingtheTilt-lockoutPin
1.Usethetiltswitchtoaligntheholeinthechassis-lockout
bracketwiththeholesintheaxle-lockoutbracket
(Figure44).
2.Removethehairpinfromthetilt-lockoutpin(Figure
45).
Note:Thetilt-lockoutpinshouldbestowedinthe
verticalholeintheaxle-lockoutbracket.
Figure45
1.Tilt-lockpin3.Axle-lockoutbracket
(verticalholes)
2.Hairpin
3.Removethetilt-lockoutpinfromthestowedposition.
4.Fullyinsertthetilt-lockoutpinthroughthehorizontal
holesinthechassis-lockoutbracketandaxle-lockout
bracket(Figure44).
5.Securethetilt-lockoutpintotheaxle-lockoutbracket
withthehairpin(Figure44).
StowingtheTilt-lockoutPin
1.Insertthetilt-lockpinthroughtheverticalholesinthe
axle-lockoutbracket(Figure45).
2.Securethepintothelockoutbracketwiththehairpin
(Figure45).
TiltingtheMachine
Usethemachinetiltfeaturetocompensateforside-to-side
tiltwhenoperatingthemachineacrossaslope.
Pushtheupperpartofthisswitchdown(Figure46)totilt
themachinerightforinclinedterrain.
Pushthelowerpartofthisswitchdown(Figure46)totilt
themachineleftforinclinedterrain.
Figure46
1.Tiltthemachineright
2.Tiltthemachineleft
Note:Usethetiltgauge(Figure47)todeterminethedegree
oftiltatwhichthemachineisoperating.
Figure47
1.Tiltgauge
PreparingtoOperatethe
Machine
Afterstartingtheenginebutbeforeoperatingthemachineat
theworksite,dothefollowing:
EnsurethattheROPSandtheseatbeltareproperly
installedandingoodworkingorder.
Ensurethatallinstrumentsareworkingproperly.
Ensurethatallattachmentsareworkingproperlyina
clear,openarea.
1.Starttheengineandwarmitup.
2.Raisetheenginespeedtothedesiredlevel.
3.Raisetheattachments.
4.Releasetheparkingbrake.
38

Table of Contents

Other manuals for Toro RT1200

Related product manuals