EasyManuals Logo

Toshiba PORTEGE Z930 User Manual

Toshiba PORTEGE Z930
423 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #229 background imageLoading...
Page #229 background image
Tests and Diagnostics
PORTÉGÉ Z930/Satellite Z930 Series Maintenance Manual (960-887) [CONFIDENTIAL] 3-127
3.34.6.7 CPU Test
1) Test content
This test performs arithmetic operation test to the CPU to verify the CPU operation.
The test processes ALU and FPU operations and allows you to check that the results are
correct.
Simple Mode / Detail Mode
Conduct the same test in both Simple mode and Detail mode.
The test content is to process the ALU and FPU operations and check that the results are
correct.
2) Test screen
Test detail:.The test details under execution are displayed. It displays in order of ALU
TEST and FPU TEST.
Progress status: Displays the progress status of the test with the progress bar.
3) Result judgment
Check whether the calculation result is the same as expected one.
In the case of PASS
The PASS Count display on the test screen is zoomed in and (OK) is displayed in the Result
field on the WinPE T&D screen.
In the case of FAIL
The Error Count on the test screen is zoomed in and (NG) is displayed in the Result field on
the WinPE T&D screen.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toshiba PORTEGE Z930 and is the answer not in the manual?

Toshiba PORTEGE Z930 Specifications

General IconGeneral
GraphicsIntel HD Graphics 4000
Battery LifeUp to 8 hours
WirelessWi-Fi 802.11a/b/g/n, Bluetooth 4.0
Storage128GB SSD
Display13.3-inch (1366x768) LED-backlit
Operating SystemWindows 7 Professional
Weight1.12 kg
PortsHDMI, VGA, Ethernet, SD card slot
ProcessorIntel Core i5 or i7