EasyManua.ls Logo

Toshiba VF-PS1 - Installing the DC Reactor

Toshiba VF-PS1
307 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E6581386
A-15
1
1.3.4 Installing the DC reactor
Q How to install (Example: VFPS1-4220KPC)
(1) (2)

Reactor unit
Reactor case
Front cover
(3) (4)
Cover
Front panel
Top panel
接続
C
onnect the reactor unit to the PO
a
nd PA/+ terminals on the main-
c
ircuit terminal board. Then
c
onnect the supplied earth wire.
See the figures on the next
page.
F
ix the front cover after connecting.
Secure the cover, front panel and top panel
to the reactor case with screws.
Remove the front cover.
Mount the reactor case on an inner wall o
f
the cabinet and secure the reactor unit to
the case with screws.

Table of Contents

Related product manuals