EasyManua.ls Logo

Transition Networks SGPAT1013-105 - Unpacking; Mounting Options; Desktop; Wall Mount

Transition Networks SGPAT1013-105
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transition Networks SGPAT10xx-x05 PoE+ Converter User Guide
33719 Rev. C https://www.transition.com Page 15 of 49
Unpacking
Verify that you have received the following items. Contact your sales representative if any item is missing.
Please save the packaging for possible future use.
One SGPAT10xx-x05 PoE+ Converter
One Cisco blue cable
One Documentation Postcard
Four Rubber Feet
Power Supply (option – sold separately)
Mounting Options
The SGPAT can be installed by wall mounting, DIN Rail, or table top installation.
Desktop
Remove the supplied four Rubber Feet from the adhesive-backed card and install on the bottom of the SGPAT.
Wall Mount
Use the option kit WMBL (4” Wall Mount Bracket) to mount the SGPAT on a wall. See the related manual for
mounting specs and instructions.
DIN Rail
Use the option kit WMVD (5” DIN Rail Mount Bracket) to mount the SGPAT on a DIN Rail. See the related manual
for mounting specs and instructions.

Table of Contents

Related product manuals