Transition Networks SGPAT10xx-x05 PoE+ Converter User Guide
33719 Rev. C https://www.transition.com Page 37 of 49
ALPT PD Power Reset (p Command)
This command will cycle power to the PD device when ALPT is enabled and the link is lost on the SFP or fixed
optic port. The converter then sets a 2-3 minute time out period internally. During the time out period the
converter will not initiate another power cycle of the PD power reset if the fiber link status is changing. After the
internal timer has expired and the fiber link is established the power cycle event will then be re-armed.
p – ALPT PD Power Reset {Port 1-2} {Disable: 0 | Enable:1}
Type p and press the Enter key to display the current stored ALPT PD power reset setting.
Type p10 and press the Enter key to disable ALPT PD power reset on TP port 1.
Type p20 and press the Enter key to disable ALPT PD power reset on TP port 2 (only when TP port 2 is present).
Type p11 and press the Enter key to enable ALPT PD power reset on TP port 1.
Type p21 and press the Enter key to enable ALPT PD power reset on TP port 2 (only when TP port 2 is present).
Operation is the same on all models.
p Command Example:
%p – ALPT PD RESET {Port 1-2} {Disable:0 | Enable:1}
example: p10 – ALPT PD RESET Disable Port 1,
p11 – ALPT PD RESET Enable Port 1
%p
ALPT PD Reset: Port 1 Enabled
ALPT PD Reset: Port 2 Enabled
%p
Auto Power PD Reset: Unavailable
%