24
10.2016
WTAL - TNX65/42
Maintenance work every 200 hours of operation
Hydraulic system
The information in the data sheets of the fluid manufacturers and in
the document Notes on Operating Materials must be observed
during all work involving fuels and fluids.
The filling quantities of the fuels and fluids are stated in the
respective fluid schedules.
• Read off the system pressure on the pressure gauge
(required pressure = 80 ± 3 bar)
The system pressure is checked when the machine is stationary,
i.e. there are no machine movements.
• Check oil level and top up if necessary.
B01