Maintenance checklist TNX65/42
E
Maintenance work every 4 000 hours of operation
No. Where What Comments
01 see A, B, C, D • Carry out all the maintenance work listed under
A, B, C and D
02 Hydraulic system • Replace hydraulic fluid
03 Power clamping
mechanism
• Check concentricity of clamping cylinder
04 Top turrets • Clean drain opening
05 Control cabinet • Clean the interior of the control cabinet
• Check and retighten connections
F
Maintenance work every 8 000 hours of operation
No. Where What Comments
01 see A, B, C, D, E • Carry out all the maintenance work listed under
A, B, C, D and E
02 Chip conveyor • Change transmission oil Note manufacturer's
documentation
03 Machine • Check fan in spindle servo amplifier
04 O-rings • Check O-rings and replace if necessary Switch on the
machine