“LIVELINK INSTALL” APP / WHAT IS A USE CASE? / PUBLIC USE CASES Page 23 / 77
Use Case “Manufacturing Hall, simple”
In the Use Case “Manufacturing Hall, simple”, the luminaire groups
“Traffic Route”, “Work 1”, “Work 2”, and “Work 3” are applied. In
addition, there are three sensors that are responsible for daylight-
dependent light control (SA1 – 3) and three sensors that are responsible
for presence detection (SV1 – 3).
Use Case “Manufacturing Hall, expanded”
In the Use Case “Manufacturing Hall, expanded”, the luminaire
groups “Traffic Route 1”, “Traffic Route 2”, “Work 1”, “Work 2”, “Work
3”, “Work 4”, “Work 5”, and “Work 6” are applied. In addition, there
are six sensors that are responsible for daylight-dependent light
control (SA1 – 6) and six sensors that are responsible for presence
detection (SV1 – 6).
Presetting of the luminaire groups
Group of luminaires Function
Traffic route • Presence detection
via the sensors SV1-3
Work 1-3 • Manual switching
• Daylight-dependent control via
sensor SA1-3
Presets of the scenes
Scene Function
Automatic • Daylight control active for groups
“Work 1-3”
• Presence detection
for group “Traffic Route”,
Fully automatic operation with
10 minutes switch-off delay
Service • Constant dimming level for all groups
at 100 %
• 20 minutes switch-off delay
Night lighting • Constant dimming level
for all groups at 20 %
• no automatic switch-off
Off • All groups off
Presetting of the luminaire groups
Group of luminaires Function
Traffic route 1-2 • Presence detection
Work 1-6 • Manual switching
• Daylight-dependent control
Presets of the scenes
Scene Function
Automatic • Daylight-dependent control active via
sensors SA1-6 (per group)
• Presence detection with 10 minutes
switch-off delay (sensor SV1-6),
fully automatic operation
Service • Constant dimming level for all groups
at 100 %
• 20 minutes switch-off delay
Night lighting • Constant dimming level
for all groups at 20 %
• no automatic switch-off
Off • All groups off
Work
Additional Meeting
S1
Additional
Work 3
Work 1
Work 4
Work 2
S1
S3
S2
S4
Additional
Meeting PresentationS1
Traffic route
Work 1 Work 3Work 2
SV1
SA1
SV2
SA2
SV3
SA3
Traffic route 1
Traffic route 2
Work 1
Work 4
Work 3
Work 6
Work 2
Work 5
SV1
SV4
SA1
SA4
SV2
SV5
SA2
SA5
SV3
SV6
SA3
SA6
Corridor (+ Centre)
Window
Board
S1
S2
HallS1 S2
Accent
Shop Window
Cash Register
Shop
S1
S2 S3
Bed 3
Bed 2
Bed 1
Table
Room
S1
S2
Bathroom
Corridor
S1
S2 S3
G3
G6
G9
G2
G5
G8
G1
G4
G7
S1
S4
S7
S2
S5
S8
S3
S6
S9
Work
Additional Meeting
S1
Additional
Work 3
Work 1
Work 4
Work 2
S1
S3
S2
S4
Additional
Meeting PresentationS1
Traffic route
Work 1 Work 3Work 2
SV1
SA1
SV2
SA2
SV3
SA3
Traffic route 1
Traffic route 2
Work 1
Work 4
Work 3
Work 6
Work 2
Work 5
SV1
SV4
SA1
SA4
SV2
SV5
SA2
SA5
SV3
SV6
SA3
SA6
Corridor (+ Centre)
Window
Board
S1
S2
HallS1 S2
Accent
Shop Window
Cash Register
Shop
S1
S2 S3
Bed 3
Bed 2
Bed 1
Table
Room
S1
S2
Bathroom
Corridor
S1
S2 S3
G3
G6
G9
G2
G5
G8
G1
G4
G7
S1
S4
S7
S2
S5
S8
S3
S6
S9