EasyManua.ls Logo

Troxler 3430 - Unpacking and Inspection

Troxler 3430
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-6
UNPACKING AND INSPECTION
Upon receipt of the gauge from the factory, a complete inspection
and inventory should be performed. If the shipping case, any other
part of the container, or the gauge appears to be damaged, notify the
carrier and your Troxler Representative immediately.
For shipping to another location or back to the factory, save the box
and any packing material. For shipping instructions and regulations,
please see Appendix D.
Check to see if the following literature and components have been
included:
Manual of Operation and Instruction
Gauge Warranty
Source Certificate
3430 Gauge
Scraper Plate
Drill Rod
AC Battery Charger
DC Charger/Adapter
One handle lock with keys
Lift the gauge from the case. Inspect the gauge for damage. Check
the lock on the handle. Ensure the keys fit the lock.

Table of Contents

Related product manuals