8.3 Switching to the Internal Steam Generator
If the building steam supply fails:
1. Open the generator electric box, switch ON the 3 Phase circuit breaker with its
Trip Coil, and ensure all the other circuit breakers are ON.
2. Observe the generator pressure gauge is at working pressure, (4.5 bar).
3. Turn OFF Building steam inlet and turn ON Generator inlet steam using the
ON-OFF-ON switch on the front panel of the autoclave.
4. Check that the Jacket pressure gauge, reaches 2.4 bar
5. Continue to work as normal.