2.3 Preliminary Check
After installation, and prior to putting the machine into operation, the following checkout
procedure is to be fulfilled:
Check the connection to local sewage. Check that the sewage pipeline is
not clogged. (Pour water for this task).
Check the connection to compressed air, pay attention to the door, set the
pressure to 6-8bar.
Check the connection to tap water. Open the water valve. Manually test the
water valves by over-riding the appropriate solenoid valve. If there are no
leaks rotate backwards the solenoid by-pass. Leave the manual inlet taps
open.
Check the connection to mineral-free water. Open the water valve. Test
manually the water valves by over-riding the appropriate solenoid valve. If
there are no leaks, rotate backwards the solenoid by-pass. Leave the water
manual inlet taps open.
Close the building manual steam inlet valve, and turn OFF Building inlet
using the ON-OFF-ON switch on the front panel.
Open the generator electric box, switch ON the 3 Phase circuit breaker with
it‘s Trip Coil, and ensure all the other circuit breakers are ON.
Turn ON Generator steam inlet using the ON-OFF-ON switch on the front
panel.
Check that the jacket pressure gauge, reaches 2.4bar. Press the Test
button mounted on the generator electric box to de-activate the internal
steam generator.
Check connections to building steam. Open the steam valve, and turn ON
Building inlet steam and turn OFF Generator steam inlet using the ON-OFF-
ON switch on the front panel. Manually test the steam valves by over-riding
the appropriate solenoid valve. If there are no leaks, leave the steam inlet
tap open.
Check that the Cover for the Microbiological Filter has been removed.
Check the connection to electricity To be performed by an authorized
electrician only!
Check the direction of the vacuum pump motor rotation.