User's Guide _______________________________________________________________________
86 ___________________________________________________________________ M210243en-A
0105-088
Figure 82 Buried ML2x Sensors
2. Pull the sensor cable close to the equipment enclosure. Cut the
cable to a proper length. Thread the cable through the connector
parts in the indicated order 1-2-3-4. See Figure 56 on page 66.
3. Strip the sensor cable wires and connect them to connector
terminals according to Table 12 below. Make sure that the
spring of lead-in connector is in good contact with the shield.
Assemble the connector.
Table 12 Cable Pins of ML2x Soil Moisture Sensor
Pin Number Wire Color Signal
1RedSupply, +
2 Yellow Signal HI
3 Blue Supply, -
4 Green Signal LO
4. Finally, connect the signal cable to the connector at the lower
base of the tube. For more information, see section Connecting
Cables on page 71.
Installing Water Level Sensors
QMV101/QMV102
For the location of the QMV101/QMV102 water level sensor, see
section Water Level on page 51.
QMV sensors have a ready-made cable and a connector. Connect the
signal cable to an available connector at the bottom of the tube (see
section Connecting Cables on page 71).