Installation, Operating & Maintenance Instructions 
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link 
 
 
 
VAT Vakuumventile AG, CH-9469 Haag, Switzerland 
Tel +41 81 771 61 61   Fax +41 81 771 48 30   CH@vatvalve.com www.vatvalve.com 
280672EB 
2010-12-15 
24/94 
 
Description  Required tool 
9.  Remove the wire coat carefully about 5mm 
 
Wire strippers 
10.  Insert the cable(s) at connector hosing as 
shown in the pictures, see also chapter CC-
Link connector 
 
Note: 
If valve in CC-Link network is at «first or last 
station» install the CC-Link cable at position 
A and close B with blind plug C. 
 
If valve in CC-Link network at 
«…stations…» install the CC-Link cables at 
position A and B. 
 
 
 
11.  Fasten the strain-relief screw until the cable 
can not pulled out by manual force 
Screw driver 
size 4 
5mm 
Shield 
Pos. A 
 
 
Pos. B 
C