2.3 Mechanical Installation
Proper installation is important to achieve optimal performance and prolong the product life. In
this section, the mechanical installation will be discussed in detail to help the personnel get to
grips with the installation process.
Be
fore proceeding with the mechanical installation, the following safety precautions need to be
taken into account.
Prior to installation, ensure that the installation procedures have been read and implemented as
per the requirement. (Refer to section 2.2 on Installation Preparation for the details). Check if any
modifications are made to the plumbing, wiring, or ventilation facility before mounting the
equipment. Once the installation preparations are taken into consideration, move on to the next
step in the installation process, and eventually set up the system.
The CRV+ cooling units are designed for split-floor installation. The indoor unit must be installed
on the floor of the equipment room or computer room. The outdoor unit must be installed
outdoors or on the floor of the other rooms as per the building architecture.
Industry-wide standards are followed for the selection, layout, and fixing of pipes.
Several factors such as pressure drop, compressor oil return, noise reduction, and vibration are
considered during the design and installation process.
Follow the design drawings strictly when installing the equipment. Reserve space as per the
maintenance and serviceability instructions in the previous chapter on Installation Preparation.
The manufacturer’s engineering dimension drawings must be taken as a reference while installing
the equipment.