Vertiv | Liebert CRV+ | User Manual 48
Once the commissioning is completed, the Vertiv engineers will confirm the same using the checklist in
Listing 2.16
Listing 2.16
Check and confirm that all the output functions are automatic
Check that the Temperature & Humidity settings as well as the control
precisions are configured correctly
Make sure all the other functions are configured and set correctly