Start-up Commissioning
5.3. Inspection After Commissioning
Once the commissioning is completed, the Vertiv engineers will conrm the same using the checklist in
Table 5-1.
Table 5-1 After Commissioning Inspection Checklist
Particulars Conrmation
Check all outputs are functional.
Check that the temperature & humidity settings as well as the control precisions are congured
correctly within range.
Check and conrm that all the output functions are automatic.
Is there any abnormal alarm.
Ensure that electrical installation checklist is conrm, refer Table 4-4.