EasyManua.ls Logo

Vertiv Liebert PDX - Maintenance and Spare Parts; Maintenance Safety Instructions; Spare Parts Guidelines; Routine Maintenance Schedule

Vertiv Liebert PDX
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
Liebert
®
PDX, EconoPhase Version - UM - 265133 - 29.08.2019
10 - Maintenance and Spare Parts
10.1 - Safety instructions
All maintenance operations must be carried out strictly by observing the European and National accident prevention regulations. We refer
especially to the accident prevention regulations concerning electrical systems, refrigerators, and manufacturing resources.
Maintenance may be done to air conditioning equipment only by authorized and qualied technicians.
In order to keep all warranties valid, the maintenance must adhere to the manufacturers regulations.
DANGER: The work should be done in the system only when it is at standstill. Do this by switching o󰀨 the air
conditioner at the controller and the main switch. Post a warning sign saying: “DO NOT SWITCH ON.” Electrical
components of device have to be switched o󰀨 and be checked that they are not under voltage.
Ignoring the safety instructions can be dangerous to persons as well as to the environment.
Soiled parts always cause a loss of performance and for switch or control devices can lead to the break-down of a plant.
10.2 - Spare parts
Only original spare parts made by Vertiv may be used. Using third party material can invalidate the warranty. When making inquiries
always refer to the ”Component List” supplied with the equipment and specify the model number, serial number and, if available, also the
part number.
NOTES:
1) When a faulty component is replaced, follow the relevant manufacturer instructions.
2) When the spare parts must be welded, be careful not to damage the internal parts (gaskets, seals, o-rings, etc.).
10.3 - Maintenance schedule
Monthly, quarterly, biannual and annual checks are to be conducted according to the following guidelines.
All tasks and periods listed here are regulations from the manufacturer and need to be documented in an inspection report.
CAUTION: All these tasks should be carried out only by an authorized and trained technician. We recommend the
Vertiv Customer Service
10.4 - Air lter check and replacement
It is important to check the state of the air lter every month to maintain a good e󰀩ciency of air distribution through the evaporator coil.
CAUTION: Sharp edges, splinters and exposed fasteners can cause personal injury! Only properly trained personnel,
electrically instructed, wearing appropriate safety headgear, gloves, shoes and glasses can carry out this operation!
DOWNFLOWUNITS
Filter Bracket
1) Switchothe unit and open the
frontpanel with thekey.
Note :Somecomponents inside
the unitcan be stillathightempe
r-
ature, wait afew minutesbefore
starting themaintenanceopera-
tion.
2)Unscrew andremovethe lter
brackets.
3) Remove airlters.

Table of Contents