Vertiv | SmartAisle2 | User Manual 84
Installation
2.9.2. Removal transportation fixtures, the damping material
To prevent the transport member from receiving portion bumps, shocks, resonance deformation, and damage,
a fastener is added at the factory. Installation fixtures must be installed in the air conditioner and the damping
should be disassembled before commissioning.
• Removal of the stoppage plate electrical box
To avoid sliding during transportation of the electric box, a limiting sheet is mounted on the electrical box at the
factory.
• Removal of piping fixtures
To avoid the long copper tube near the sheet metal, lead brass is clamped for split vibration along with vibration
damping foam at the factory. Prior to commissioning, the materials must be cleaned and removed.
• Adjust the guide grille
The Liebert CRV+ air conditioning installation position in the field can be adjusted in the mounting direction
of the guiding grille to the left or right of the wind guide. For adjustment mode, refer to the Liebert CRV+ user
manual.
• Plugging holes in the roof of the air conditioner
To facilitate the onsite installation of the air conditioner, small holes pre-positioned on the roof must be closed;
use a stopper present in the delivered accessories and block the remaining bolt holes to prevent the water from
entering the cabinet. Operation methods for doing so are listed in detail in the CRV+ series of PACs user manual.