EasyManua.ls Logo

Vetus M2.13 - Page 35

Vetus M2.13
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
5 Use
General guidelines
note
First commissioning
Follow the instructions given for ‘First com-
missioning’ on page 20 and further if the en-
gine is being commissioned for the rst time.
After repair work:
Check that all guards have been replaced and
that all tools have been removed from the en-
gine.
When starting with pre-heating, do not use
any other substance (e.g. injection with ‘Easy
Start’). Doing so could result in an accident.

Table of Contents

Related product manuals