CT 36 / CT 48 Maintenance
wc_tx000374gb.fm 41
4.2 Periodic Maintenance Schedule - Wacker
The chart below lists basic machine and engine maintenance. Refer to
the engine manufacturer’s Operator’s Manual for additional
information on engine maintenance.
* Perform initially after first 20 hours of operation.
Maintenance, replacement or repair of emission control devices and systems may be performed by
any repair establishment or individual.
Daily After
first 20
hours
Every
2 weeks
or
50 hrs.
Every
month
or
100 hrs.
Every
year
or
300 hrs.
Every
500 hrs.
Check fuel level.
Check engine oil level.
Inspect fuel lines.
Inspect air filter. Replace as
needed.
Check external hardware.
Clean trowel after each use to
remove concrete splatter.
Change engine oil. *
Grease blade arms as needed
Clean air cleaner elements.
Clean sediment cup / fuel filter.
Check and clean spark plug.
Check and adjust valve clear-
ance.
Replace spark plug.

Table of Contents

Other manuals for Wacker Neuson CT 48

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson CT 48 and is the answer not in the manual?

Wacker Neuson CT 48 Specifications

General IconGeneral
BrandWacker Neuson
ModelCT 48
CategoryTrowels
LanguageEnglish

Related product manuals