3-80 BA 1404 en – Edition 2.7 * * 1404b340.fm
Operation
Excavator work position
Proceed as follows:
Place stabilizer blade A on the side you want to dig
Bucket position when digging
Move the bucket as shown in A.
Move the flat side of the bucket parallel to the ground.
Notice!
Position B causes the bucket to penetrate into the ground. Work slows down, and the
engine and the hydraulic pump are subject to overload if this position is used over a
longer period of time!
Position C causes the bucket to be forced upward and not to be filled completely.
Excavate as follows:
Penetrate into the ground with bucket D
Lower the stick and at the same time align bucket E until
reaching the required digging depth and
the flat side of the bucket is parallel to ground
Pull bucket E parallel to the ground toward the excavator;
if possible, at the same time:
Move the stick toward the excavator
Lower the boom
With a sufficiently full bucket E:
Keep on moving the stick toward the excavator and at the same time
Tilt in stick F
Excavating trenches
Excavating trenches is more efficient
by using a suitable bucket for this work and positioning the tracks parallel to the limit
line of the trench.
In case of large trenches, first excavate the side sections and then the center section.
Abb. 170: Excavator work position
A
Abb. 171: Bucket position
A
B
C
Abb. 172: Penetrating into the ground with the bucket and
aligning it
D
E
Abb. 173:Filling the bucket
E
F
Abb. 174: Excavating trenches