EasyManua.ls Logo

Wazer Pro - Page 45

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Finalize water connections
Install the On/Off Valve
Perform a Leak Test
1. Install the Inlet Water Filter and On/Off Valve
Once you have completed the three hose connections, install of the Water Filter and On/Off
Valve needs to be done.
It is important to shut the Water Inlet Hose off whenever WAZER Pro is left idle; not
doing this could lead to a massive water leak or damage to the unit.
2. Perform a Leak Test
Inspect all water connections. Make sure every connection is well-seated and matches the
descriptions in this User Manual.
Turn on the water supply to the Water Inlet Hose, and turn on the On/Off Valve
Inspect every point in the connection for leaks.
Leave the water supply on for a few minutes and recheck the connections for any slow drips.
Shut the On/Off Valve before continuing on to the next section.
Note 3 Pg.17
Setting Up WAZER Pro |
SECTION 4
39