Finalize water connections
•
Install the On/Off Valve
• Perform a Leak Test
1. Install the Inlet Water Filter and On/Off Valve
Once you have completed the three hose connections, install of the Water Filter and On/Off
Valve needs to be done.
It is important to shut the Water Inlet Hose off whenever WAZER Pro is left idle; not
doing this could lead to a massive water leak or damage to the unit.
2. Perform a Leak Test
• Inspect all water connections. Make sure every connection is well-seated and matches the
descriptions in this User Manual.
• Turn on the water supply to the Water Inlet Hose, and turn on the On/Off Valve
• Inspect every point in the connection for leaks.
• Leave the water supply on for a few minutes and recheck the connections for any slow drips.
• Shut the On/Off Valve before continuing on to the next section.
Note 3 Pg.17
Setting Up WAZER Pro |
SECTION 4
39