6.6 Manual Control Panel (MCP) - Option for WiCE
6.6.1 Operate the manual control panel (MCP)
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 0.5 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Intermediate 1
Support equipment
Description Part No. CSN QTY
None
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine control system must be set to on.
X92-B
AA00-4618-00AAC-131A-A
Operation Manual Operate the manual control panel (MCP)
Winterthur Gas & Diesel Ltd.
- 222 - Issue 002 2021-11