Air/uegasrouting
Oil condensing boilers with a separate, concentric, balanced ue outlet (DN 80/125 or
DN 110/160) above the roof, type C33 x, may only be installed in attics, or in rooms
where the ceiling also forms the roof, or where only the roof construction is located
above the ceiling.
If the pipework for the combustion air supply and ue gas routing crosses different
oors in the building, route the pipes outside the boiler room inside a duct with a re
resistance of at least 90 minutes, and in living spaces of low height with a resistance
of at least 30 minutes.
Topreventuegas beingdrawnbackthrough adjacentroofoutlets
whereseveralueoutletsarearrangednexttoeachotherandboiler
faults linked to this, arrange the outlets at approximately the same
heightandwithatleast600mmbetweenthem.
The maximum permissible straight length for concentric balanced ue routing must
not exceed 16 m with an internal diameter DN 80/125, or 21 m with DN 110/160. The
calculated length of the balanced ue routing comprises the straight pipe length and
the length of the pipe bends. In this calculation, an 87° bend is calculated as being
1.5 m and a 45° bend as being 1 m.