In the vertical part of the ue, a cleaning and inspection aperture is required immediately
above or below the ue diverter if the distance from the centre of the cleaning and
inspection aperture in the horizontal part of the ue to the vertical axis of the ue is
greater than 30 cm.
The distance can be up to 1 m if the inspection aperture in the horizontal part of the ue
is arranged on the front and if there are no diverters in the ue from this cleaning and
inspection aperture to the vertical part.
In the upper part of the ue arranged inside the building (< 5 m), a cleaning and
inspection aperture is required if cleaning or inspection cannot be carried out from the
roof.
Before commissioning the combustion system, have the safe usability of the ue
system conrmed by the local ue gas inspector [in Germany; check local regulations].
Installingtheue
26
16
23
24
25
26
27
33
3737373738
32
26
35
34
2
32
26
35
34
2
32
26
35
34
2
32
26
35
34
2
36
1 Oilcondensingboiler
2 Connectionadaptorwithtestnipplefor air and ue
gas (included in COB standard delivery)
16 Pipecollar
23 supportrail
24 87°supportbend
25 Spacer
26 PP pipe
27 Shaftcover
33 PP outlet
34 ChecktheFluegasdamper
35 Extension(whererequired)
36 Trap
37 PPheader
38 Endpiecewithinspectionapertureandcondensate
drain
Secondary
ventilation
Example of an open ue cascade design according to type B23
1 1 11
26 Cascadeoperation-Fluegas
headerdesign