In the vertical part of the ue, a cleaning and inspection aperture is required immediately
above or below the ue diverter if the distance from the centre of the cleaning and
inspection aperture in the horizontal part of the ue to the vertical axis of the ue is
greater than 30 cm.
The distance can be up to 1 m if the inspection aperture in the horizontal part of the ue
is arranged on the front and if there are no diverters in the ue from this cleaning and
inspection aperture to the vertical part.
In the upper part of the ue arranged inside the building (< 5 m), a cleaning and
inspection aperture is required if cleaning or inspection cannot be carried out from the
roof.
Before commissioning the combustion system, have the safe usability of the ue
system conrmed by the local ue gas inspector [in Germany; check local regulations].
Installingtheue
26
16
1 Oilcondensingboiler
2 Connectionadaptorwithtestnipplefor air and ue
gas (included in COB standard delivery)
16 Pipecollar
23 supportrail
24 87°supportbend
25 Spacer
26 PP pipe
27 Shaftcover
33 PP outlet
34 ChecktheFluegasdamper
35 Extension(whererequired)
36 Trap
37 PPheader
38 Endpiecewithinspectionapertureandcondensate
drain
Secondary
ventilation
Example of an open ue cascade design according to type B23
1 1 11
26 Cascadeoperation-Fluegas
headerdesign