9 Maintenance and Inspection
MH80 Manipulator 9.1 Inspection Schedule
9-2
158813-1CD
HW1480080
Table 9-1: Inspection Items
Items
1)
Schedule Method Operation Inspection
Charge
Daily
1000HCycle
6000HCycle
12000HCycle
24000HCycle
36000HCycle
Specified Personnel
Licensee
Service Company
1 Alignment marks
••••••
Visual Check alignment mark accordance at the home position.
Check for damage.
•••
2 External cables
••••••
Visual Check for damage and deterioration.
•••
3 Working area
and whole exterior of
manipulator
••••••
Visual Clean the work area if dust or spatter is present. Check for
damage and outside cracks.
•••
4 SLURBT-axis motors
••••••
Visual Check for grease leakage.
2)
•••
5 Baseplate mounting bolts
••••••
Wrench Tighten loose bolts. Replace if necessary.
•••
6 Cover mounting screws
••••••
Screwdriver,
Wrench
Tighten loose bolts. Replace if necessary.
•••
7 SLURBT-axis motor
connectors
••••••
Manual Check for loose connectors and tighten if necessary.
•••
8 Connector base
••••••
Manual Check for loose connectors.
•••