SECTION 6 - TECHNICAL DATA
1. Floor or steel frame should be level and smooth.
2. For pad installations, isolators do not normally
require bolting. If necessary, anchor isolators to
oor through bolt holes in the base plate.
Isolators must be bolted to the substruc-
ture and the equipment must be bolted to
the isolators when outdoor equipment is
exposed to wind forces.
3. Lubricate the threads of adjusting bolt. Loosen the
hold down bolts to allow for isolator adjustment.
4. Block the equipment 10 mm (1/4 in.) higher than
the specied free height of the isolator. To use the
isolator as blocking for the equipment, insert a 10
mm (1/4 in.) shim between the upper load plate
and vertical uprights. Lower the equipment on the
blocking or shimmed isolators.
5. Complete piping and ll equipment with water,
refrigerant, etc.
6. Turn leveling bolt of rst isolator four full revolu-
tions and proceed to each mount in turn.
7. Continue turning leveling bolts until the equip-
ment is fully supported by all mountings and the
equipment is raised free of the spacer blocks or
shims. Remove the blocks or shims.
8. Turn the leveling bolt of all mountings in either
direction in order to level the installation.
9. Tighten the resilient washer and underside of
channel cap plate.
10. Installation is now complete.
Illustration shows single spring CIP-B or CIP-C mount.
HCL
SBC
Slot Width - SW
HCW
MAX BOLT
DIA. - MBD
BASE PLATE DIMENSIONS
NON-SKID NEOPRENE
ACOUSTICAL ISOLATION PAD
(Bolting to floor is not necessary for
indoor applications)
All springs have additional
travel to solid equal to 50%
of the rated deflection.
A
L
FREE &
OPERATING
HEIGHT
T
W
FERROUS HOUSING
SIDE ACCESS INTERNAL
ADJUSTMENT BOLT
Turn clockwise to load
spring and maintain Free
& Operating Height.
Dowel Pin is 3/8" dia. for
CIP-A & 1/2" thereafter
Mounting may be
operated 1/2" above
Free & Operating
Height.
NOTE-
CIP Mounts are not
to be used in seismic
or wind load
applications.
EQUIPMENT BASE
TYPE CIP DIMENSIONS (inches)
†Casting dimensions may vary ±1/8"
Size ALTWSW HCL HCW MBD SBC
Free
Ht.
CIP-B 8
/
4
/
2
/
16
8
CIP-C 6
/
8
/
16
/
8
5
1
1
7
7
3
3
/
8
1
6
/
4
3
/
5
/
4
3
8
/
8
7
/
16
9
2
/
4
3
3
/
2
1
/
2
/
4
1
1
6
7
/
2
/
4
1
3
1
1
/
4
/
8
1
7
7
7
Min
Ht.
5
/
4
1
6
/
4
3
6