ACH580 Installation, Operation and Maintenance Manual 51
ACH580-01 Installation
Other ways to complete commissioning
HVAC checklist
commissioning
Assistant
commissioning
Start/stop, reference
and scaling
Ramps, limits, interlock,
run permissive
2 3
1
Complete the
two assistants.
Go through the items
on the menu
Set the start/stop and reference
Commissioning with
Primary settings
Set the ramps
Commissioning with
parameters.
For advanced users only.
5
Set the motor data
Set the limits
Continue with further adjustments
on the Primary settings menu.
4
Run & set reference on
the panel
Drive is now ready to be
run in the Hand mode.
Press the Hand key
on the panel to
start the motor.
Set the reference on the
panel.
Hand