EasyManua.ls Logo

ABB ACH580 Series - Installation - Bypass

ABB ACH580 Series
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
90 ACH580 Installation, Operation and Maintenance Manual
ACH580 E-Clipse Bypass
Installation – Bypass
WARNING! When the ACH580 with E-Clipse Bypass is connected to the line power,
the Motor Terminals T1, T2, and T3 may be live even if the motor is not running. Do
not make any connections when the ACH580 with E-Clipse Bypass is connected to
the line. Disconnect and lock out power to the drive before servicing the drive.
Failure to disconnect power may cause serious injury or death.
1. Install wiring – Bypass
WARNING!
β€’ Metal shavings or debris in the enclosure can damage electrical equipment and
create a hazardous condition. Where parts, such as conduit plates require cutting
or drilling, first remove the part. If that is not practical, cover nearby electrical
components to protect them from all shavings or debris.
β€’ Do not connect or disconnect input or output power wiring, or control wires, when
power is applied.
β€’ Never connect line voltage to drive output Terminals T1, T2, and T3.
β€’ Do not make any voltage tolerance tests (Hi Pot or Megger) on any part of the
unit. Disconnect motor wires before taking any measurements in the motor or
motor wires.
β€’ Make sure that power factor correction capacitors are not connected between the
drive and the motor.

Table of Contents

Other manuals for ABB ACH580 Series

Related product manuals