ACH580 Installation, Operation and Maintenance Manual 9
ACH580-01 Installation
Vertically side by side
2.
Prep
are for installation
Lifting R1…R4
Lift the drive only by the chassis.
Lifting R5…R8
1. Use a pallet truck to move the transport package/enclosure to the installation site.
WARNING! Frames R5…R9: Lift the drive with a lifting device. Use the lifting eyes of
the drive. The drive is heavy and its center of gravity is high. An overturning
drive can cause physical injury.
2. Use a hoist to lift the drive. (Do not place drive in final position until mountin
g site is
prepa
red.)
Unpack the drive
1. Unpack the drive.
2. Check for any damage and notify the shipper immediately if damaged compone
nts
are found.
3.
Check the contents against the order and the shipping label to verify that
all parts
have been
received.
1) Free space above is measured from the frame, not from the hood used in
UL (NEMA) Type 12 frames.
Note: The height of the hood for frames R4 and R9 exceeds the requirement of
free space above for these frames.
2) Free space below is always measured from the drive frame, not from the
cable box.
Frame
size
Vertical installation side by side - Free space
Above (a) Below (b)
1)
Between (c)
mm in. mm in. mm in.
R1
2)
200 7.87 200 7.87 0 0
R2
2)
200 7.87 200 7.87 0 0
R3
2)
200 7.87 200 7.87 0 0
R4 200 7.87 200 7.87 0 0
R5 200 7.87 200 7.87 0 0
R6 200 7.87 300 11.81 0 0
R7 200 7.87 300 11.81 0 0
R8 200 7.87 300 11.81 0 0
R9 200 7.87 300 11.81 0 0
a
b
a
b
c= 0