12. Connection of Office Alarms
Introduction
This section explains the installation procedure to connect the office alarms.
Connecting Controller Alarms
Connecting Office Alarms
Step Action
Choose the appropriate illustration from the following list:
· Figure 12-1: Millennium II Controller with Insulation Displacement Alarm Board
· Figure 12-2: Millennium II Controller with Wire Wrap Alarm Board
Route wires (installer provided, 22-gauge maximum) from the office alarm block back to the controller by
Figure 12-1: Millennium II Controller with Insulation Displacement Alarm Board