Planning the installation 35
4
Planning the installation
What this chapter contains
This chapter instructs in planning the mechanical and electrical installation.
Selecting the location for the inverter
WARNING! Do not install the inverter in a location where:
corrosive, explosive or flammable materials are used or stored
there is a risk of mechanical impacts
there is a lot of dust, or any conductive dust
there is a risk of flooding or snow or sand piling
inverter will be near to a heat source. Exposure to external heat will reduce the
power output capacity and shorten the component lifetime.
The product is designed for indoor and outdoor installations which meet the
safety, ambient conditions and free space requirements. The installation site must
meet the specification in section Environmental data and requirements on page
115.
The supporting structure
and fastenings must be
strong enough to support
the weight of the inverter
unit(s) and must be made
of non-flammable material.
See section Mechanical
data on page 116.
The installation room or
cabinet must have
adequate ventilation,
airflow and cooling for all
equipment inside. See
Mechanical data on page
116. See Required
clearances for cooling on
page 123.

Table of Contents

Other manuals for ABB PVS300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVS300 and is the answer not in the manual?

ABB PVS300 Specifications

General IconGeneral
BrandABB
ModelPVS300
CategoryInverter
LanguageEnglish

Related product manuals