EasyManua.ls Logo

ABB PVS300

ABB PVS300
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
64 Electrical installation
7 Pull lightly to check that the
contact has properly engaged.
8 Insert the test pin with the
corresponding side into the
socket or plug. If the contact is
properly assembled, the white
marking on the test pin must
still be visible.
9 Screw on the cable gland
hand-tight and then tighten it
to the correct torque for the
solar cables used. Typical
values are 2.5 Nm to 3 Nm.
Description

Table of Contents

Other manuals for ABB PVS300

Related product manuals