I
ref
is the given reference load current
2
operate Bx ref Trip
III
is the operate level heat content
I
Bx
is the selected base current based cooling system
ON
/
OFF
I
Trip
is the operate level load current
θ
n
is the current heat content
Consider that the given system has
IBase
of 1000 A and the cooling system is
ON
. The
following settings are used to calculate the operate time:
IRef
110%
IBase1
110% of IB
IBase2
120% of IB
Tau1
150 min
Tau2
90 min
IHighTau1
110% of IB1
Tau1High
125% of tC1
ILowTau1
90% of IB1
Tau1Low
75% of tC1
IHighTau2
110% of IB2
Tau2High
115% of tC2
ILowTau2
90% of IB2
Tau2Low
85% of tC2
ITrip
120% of IBx
ThetaInit
50%
ResLo
60% of Itr
As the cooling system is
ON
,
IBase2
is selected as the base current and
Tau2
setting is selected
as the time constant.
For example, the largest phase load current is taken as 1800 A, then:
2
1800
1.
2677685.95
1
final
2
(1.2 1000 1.1 1.2) 2509056
operate
Here
At t=0
0.5 2509056 1254528
n init operate
ThetaInit
At next execution, θ
n-1
=1254528 and θ
n
=1254555.04.