EasyManua.ls Logo

ABB RMC-100 - Customizing the LCD Display

ABB RMC-100
215 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2105552MNAE | RMC-100 | 75
5.3 Configure low charger alarm
An alarm displays on the LCD when Low Charger Alarm is enabled and the voltage from the charger is
0.4 volts below the battery voltage. If Low Charger Alarm is disabled, the alarm does not display.
Low Charger Alarm State is read-only and displays the current state: Not in Alarm, or In Alarm.
To enable the alarm:
1. Launch PCCU and click View on the menu bar. Then click Expert to enter Expert view.
2. Click the station ID (the top item on the navigation tree) to display the Station Setup screen.
Scroll down to the Low Charger Alarm Enable section (Figure 5-3
). Click the Low Charger Alarm
Value column and select Enabled from the drop-down list.
Figure 5-3: Low charger alarm
3. Click Send.
5.4 Customize the LCD display
The maximum number of characters per row on the display is 21 (X location with a range 0 to 20).
The size of a character is 8 x 6 pixels.
The maximum number of lines on the display is 8 (Y location). Lines 3 and 6 are separator lines. Lines
7 and 8 are reserved for the annunciators. Two pairs of lines are reserved for the display items with
data, units, annunciators, and plot (optional): lines 1 (Y=0), 2 (Y=1), and 4 (Y=0), 5 (Y=1). For both
pairs, the top line has a Y location of 0. The second line has a Y location of 1. These locations indicate
position relative to the pair, not the entire height of the LCD (Figure 5-4
).
Figure 5-4: LCD display items
During operation, the LCD continuously scrolls through the operating parameters. Table 5-1
shows the
parameters that typically display. The display is customizable.
Table 5-1: RMC display item options
Display
item
Default format
Description
Notes
DATE/TIME
MM/DD/YY
HH:MM:SS
Current Date and Time
24-hour clock
YEST DP LO
NN PERCENT
Yesterday’s Percent DP
Low Limit
Percent time below DP Low Set Point
YEST DP HI
NN PERCENT
Yesterday’s Percent DP
High Limit
Percent time above DP High Set Point
LINE 1
LINE 2
LINE 3
LINE 4
LINE 5
LINE 6
LINE 7
LINE 8
(Y) 0
(Y) 1
(Y) 0
(Y) 1
(X)0…………………………………………Characters…………………………………...….19 20
NAME
DATA UNITS
NAME
DATA UNITS
A2 A3 A4 A5 A6 A7 A8A1

Table of Contents

Other manuals for ABB RMC-100

Related product manuals