EasyManua.ls Logo

ABB SCK - Replacing Membrane Pump Membranes: Gas Sampling Probe H

ABB SCK
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42/23-81 EN Rev. 4 System Manual SCK Gas Sampling System 181
Step Procedure
17
Switch circuit breaker -F34 back on.
18
Close control cabinet again.
19
Unlock EMERGENCY STOP switch, turn service switch back to
OFF position and insert probe again using the controller.
WARNING! Probe moves into the kiln. Do not stand in the area of
travel of the probe or probe carriage until the probe is com-
pletely inserted into the kiln and the warning lamps go out.

Table of Contents