3-52 Machine Maintenance Procedures
4. Carefully place the LCD panel (C) on the LCD cover. Make sure that the bottom
corners are properly aligned with the top edge of the LCD hinges (Figure 3-68).
5. Install and secure four (4) screws (A) to the LCD panel (Figure 3-68).
Figure 3-68. Replacing the LCD Panel
Make sure the eDP and camera cable, WLAN antennas, and WWAN antennas
(for C732L & C732LT only) are moved away from the device to avoid damage
during installation.
ID Size Torque Quantity Screw Type
A M2.0*3.0 2.0±0.2KGF/CM 4