Page 4
Typical Connection
Most jobs are pre programmed at the
factory. Yo u must land the wires from the
breakers to the designated relays and
connect them to the correct loads for the
programming to work!
Note: If you use a gutter the neutrals do
not need to be sent through or landed in
the panel.
The panel schedules should be at the
beginning of this manual and also in a
pocket on the door of each panel.
Please follow the panel schedule and
you will save everyone a lot of work.