EasyManua.ls Logo

Acuity Controls GR2400 User Manual

Acuity Controls GR2400
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
LC&D Operation,
Programming and
Maintenance Manual
Project Name:
Project Location:
Acuity Agency:
Order #:
PO #:
Project ID:
Date:
Controls Tech Support:
1-800-535-2465 - option 1: nLight; option 2: SSI; option 3: Fresco; option 4: Synergy; option 5: LC&D/Bluebox; option 6 ROAM
To preschedule a call with tech support (providing a 4 hour business lead time) go to the following
link: http://www.acuitybrands.com/resources/schedule-support-request
Additional Technical Literature:
https://www.acuitybrands.com/products/controls/lcd
1

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Acuity Controls GR2400 and is the answer not in the manual?

Acuity Controls GR2400 Specifications

General IconGeneral
BrandAcuity Controls
ModelGR2400
CategoryRelays
LanguageEnglish

Summary

GR 2400 System Setup

Hooking up the GR 2400 System

Basic system components and connection overview.

Troubleshooting Bus Issues

Troubleshooting Voltage Drop with Multiple Switches

Solutions for voltage drop when using many switches on a bus.

Addressing Bus Length Limitations

System Components

Relay Types and Specifications Overview

Describes different relay types like SnapLink, SoftStart, and 2-pole relays.

GR 2432/2448 Relay Card Management

GR 2432/2448 Board Addressing

Process for addressing relay boards on the bus.

GR 2432/48 Card Modes Explained

Details the 8 Zone, 16 Zone, and Discrete modes for GR cards.

Relay and Zone Management

Understanding LED Indicators

Interpreting Flashing Assign LED Status

Interpreting the flashing Assign LED status.

GR 2400 System Programming

Navigating the Clock Interface

User Menu Navigation

User Menu: Reviewing and Changing Schedules

How to access and modify schedules via the User Menu.

Schedules and Groups Management

Defining, Disabling, and Programming Groups/Schedules

Steps to define groups, disable schedules, and program groups.

Group Properties and Configuration

Group Properties Explained in Detail

Details properties like MOMENTARY, MAINTAIN, and TIMER for groups.

Manual Control and System Setup

Manual Override and System Setup Access

Performing manual operations and accessing system setup.

System Setup Menu Options

System Setup: Time, Holidays, and System Options

Configuring time, holidays, and system-wide options.

System Options and Security

System Options: Keyboard Lock Code and Location

Setting keyboard lock codes and system location for timing.

Event Scheduling and Control

Scheduled Events Overview and Listing

Lists events in order of occurrence from all schedules.

Relay Properties and Control

Relay Properties: Control Sources and Delay Times

Identifying controls for groups/relays and adjusting relay delay times.

Relay Configuration Settings

Advanced Relay and Zone Parameters

Bus Diagnostics and Addressing

Bus Diagnostics: Addressing Bus Scan Menu

Navigating the bus scan menu for addressing and diagnostics.

Group Loads and Sequencing

Group Loads Menu and ON/OFF Sequencing Function

Using the Group Loads Menu and ON/OFF sequencing.

Sequence Programming

Sequence Programming: Switches and Buttons

Steps for programming switch buttons and sequences.

Clock Features and Setup

Error Statistics and Diagnostics

Bus Diagnostics Details

Factory ID Scan and Bus Collisions

Photocell Control Cards

Basic Photocell Settings

Basic Photocell Settings: Programming Trigger Levels

Setting ON/OFF levels and time delays for photocell triggers.

Photocell Settings: Trigger Level Programming

Detailed steps for setting ON/OFF levels and time delays for photocells.

Daylight Harvesting and Special Situations

Remote System Access and Settings

GR 2416 Card Mode Changes

Appendix II: System Start Up Checklist

GR 2400/1400 System Start Up Checklist

A step-by-step checklist for starting up the system.

Startup Checklist: Power and Bus Verification

Verifying system power, bus connection, and termination.

Startup Checklist: Panel Power-Up and Clock Verification

Steps for powering up panels and verifying clock communication.

Troubleshooting, Training, and Support

GR 2400 Series Specifications

Navigation Basics

Programming a Digital Switch

Adding or Deleting Loads

Editing Time Schedules

Schedule Types and Trigger Events

Control Types and Group Types

Programming Groups

Chelsea Digital Switch Advanced Programming

Chelsea Digital Switch: Advanced Programming Overview

Introduction to advanced programming for Chelsea Digital Switches.

Chelsea Digital Switch Overview

Important Programming Notes

Switch Setup Screen (First Screen)

Switch Setup: Understanding '7 ON =' Parameter

Switch Setup: Understanding '8 ON =' Parameter

Switch Setup Screen (Second Screen)

Button Edit Screen

Button Edit: Toggle Mode and Debounce

Common Applications

Common Applications: Disabling Switch Buttons

Step-by-step guide to disabling switch buttons using virtual buttons.

Common Applications: Audible Error Beep for Disabled Buttons

Setting up audible alerts for disabled button presses.

Common Applications: Audible Alert During Blink Warning

Configuring switches to provide audible alerts before lights shut off.

Common Applications: Partition-Controlled Switch Functionality

Setting up switches to change function based on room partition status.

Common Applications: Implementing Partition Controls

Detailed steps for programming switches based on partition status.