Agilent Technologies N5161A/62A/81A/82A/83A MXG Signal Generators Service Guide
Post-Repair Procedures and Performance Verification
Post Repair Procedures
4-7
? ? ?
DCFM Carrier Offset
??
Amplitude Switching Speed
? ? ?
Frequency Switching Speed
???
Timebase Aging Rate
? ? ?
Internal Rise Fall Time (Option UNW)
a
The manual phase noise test is required as part of a
complete performance verification (refer to Table 4-3 on page 5).
Table 4-5 Automated Performance Verification Tests (Continued)
N5161A
N5181A
N5162A
N5182A
N5183A
a
Automated performance verification tests are listed in the order they should be performed to prevent invalid results and to minimize changes in
test equipment configurations.