57
PlatformLevel
AdjustSwitch
Stop
Up
Down
M098L920
Fig.8‒44
NOTICE
Theplatformstopsautomaticallyafter
acertainperiodoftimetoprevent
occupantsandloadfromdumping
out.Releasetheswitchestocontinue
adjustment.
5‒2 BleedingAirfromPlatform
LevelingSystem
WARNING
•Usethelowercontrolstobleedairfrom
theplatformlevelingsystem.
•Donotallowanypersonorobjectonthe
platformwhenbleedingair.
Iftheplatformdoesnotstaylevelafter
adjustment,airmayhaveenteredtheplatform
levelingsystem.Inthiscase,bleedairfromthe
platformlevelingsysteminthefollowingway.
󱒸󱓙󱓊󱓕󱒅󱒖
Putthemachineonfirm,levelsurface.
󱒸󱓙󱓊󱓕󱒅󱒗
Movetheboomtoapositionwhereitiseasyto
adjust.
󱒸󱓙󱓊󱓕󱒅󱒘
Holdtheenableswitchupto“ON”.Operatethe
platformlevelingswitchonthelowercontrols
tofullytilttheplatformforwardandbackward
severaltimes.
EnableSwitch
PlatformLevelAdjustSwitch
M1991G2-1
Fig.8‒45
PlatformLevel
AdjustSwitch
Stop
Up
Down
M098L920
Fig.8‒46
󱒸󱓙󱓊󱓕󱒅󱒙
Adjusttheplatformsoitbecomeslevel.
󱒸󱓙󱓊󱓕󱒅󱒚
Repeattheboomraising,loweringand
telescopingoperationsseveraltimesandmake
surethattheplatformstayslevel.
󱒨󱓍󱓆󱓕󱓙󱓊󱓗󱒅󱒝󱒅󱒒󱒅󱒴󱓕󱓊󱓗󱓆󱓙󱓎󱓔󱓓