33
Booting the Switch
To boot the switch, plug all power supply cords into easily-accessible, properly grounded power outlets.
(Do not use extension cords.)
The switch will power on and boot automatically.
Note. If more than one power supply is installed, be sure to plug in each power
supply in rapid succession, (i.e., within a few seconds of each other). This
ensures that there will be adequate power for all components throughout the
boot process.
Component LEDs
During the boot process, component LEDs will flash and change color, indicating different stages of
the boot.
Following a successful boot, LEDs on the primary CMM should display as follows:
Note. Be sure the boot process is complete before checking LED status. If LEDs
indicate persist errors, contact Alcatel-Lucent Customer Support.
Once the switch has completely booted, connect to the console port and log in to the switch’s Command
Line Interface (CLI) and configure basic information. Continue to “The First Login Session” on page 34.
PRI Solid Green
PS Solid Green
FAB Solid Green
TEMP Solid Green